Download
Brochure
Program Co-located with
GILEX
Go

Smart Farm Korea

May 27(Wed) ~ 29 (Fri), 2026, 3days
Exhibition Halls 1 & 2, Changwon Convention Center (CECO)

Booth Application Guide

Booth construction and additional facilities are optional.
Please see the details below and the attached files (Booth Guide & Booth Design Samples).

Space Only Booth
(Area)

USD 2,000

Included

  • Space only (3m × 3m)
  • Minimum of 2 booths when applying as a single exhibitor
  • Exhibitor is responsible for booth setup and dismantling
  • If booth construction is required, submit drawings to the Secretariat for approval before installation
  • Electricity is not included and must be applied for separately

Standard Booth
(Octanorm)

USD 2,300

Included

  • Space-only booth + installation fee included
  • Size: 3m × 3m × 3.25m (H)
  • Information desk and folding chairs
  • Company name sign
  • Carpet (Pytex)
  • 1 power outlet, 1KW electricity
  • 3 spotlights and fluorescent lighting

Carpentry Panel Booth

USD 2,600

Included

  • Space-only booth + installation fee included
  • Size: 3m × 3m × 2.5m (H)
  • Information desk and folding chairs
  • Company name sign
  • Carpet (Pytex)
  • 1 power outlet, 1KW electricity
  • 3 spotlights and fluorescent lighting

Additional Options

Varies by option

Included

  • Additional display items
  • Information desk, etc.

Additional Facilities (Add-ons)

Electricity (Single-phase 220V / Three-phase 220V / Three-phase 380V, standard hours 09:00–18:00)
Apply in 1KW units if basic power is required
USD 50 / KW
Electricity (24-hour use)
USD 60 / KW
Power outlet inside space-only booth
USD 30 / point
Telephone (domestic)
USD 50 / line
Telephone (international)
USD 150 / line
Internet LAN
USD 150 / Port
Water supply & drainage
USD 200 / point
Compressed air
USD 200 / point
Gas
USD 500 / point

※ All fees include installation and are valid for use during the exhibition period. No separate settlement is required.

Key Dates

  1. 01
    Application deadline
    (Deadline may change)
  2. 02
    Booth construction
    2026.05.25 – 05.26 (2 days)
  3. 03
    Move-in (exhibits)
    2026.05.26 (1 day)
  4. 04
    Exhibition period
    2026.05.27 – 05.29 (3 days)
  5. 05
    Move-out & dismantling
    2026.05.29 (1 day)

How to Apply & Payment

How to apply
  1. Website application → Submit the application online, then receive the contract and invoice
  2. Email application → Submit the application form, then confirm by phone
Required documents
Application form, Business registration certificate
Submitting the application
Your application is confirmed after submitting the form and paying the deposit (50% of booth fee).
※ After submission, unilateral cancellation without prior notice to the Secretariat may incur a penalty.
Payment details
Bank: Shinhan Bank
Account: 110-545-992428​
Account holder: EunJungPark
Payment deadline: Apr 30, 2026
SWIFT Code : SHBKKRSE Bank Address : 9, Centum dong-ro, Haeundae-gu, Busan, Republic of Korea Bank Telephone : +82-51-744-6072